Emission Control
American Environmental
Fabrication & Supply, LLC


a
American Environmental Fabrication & Supply Logo
Natural Gas Conditioning
Gas Separation Systems
VOC Biofiltration Systems
Granulated Carbon Systems
VOC Concentrators
Automated PLC Controls
Equipment Inspections - Installation - Rebuilds
Low NOx Burners
PSA Systems
a
Benefits of Renting vs. Owning Air Pollution Control Equipment
We have a ready to use air pollution control fleet or can design a specialized system for your plant operations. Some of the available systems include:
Granulated Activated Carbon (GAC) Systems, Biological Oxidation Systems, Wet Scrubbers, Regenerative, Catalytic and Direct Fired
Thermal Oxidizers
. Rentals range from 6 months to 5 years with flexible options.
Products


a
Treatment Information
Helpful Equipment Information
Photo Gallery
Helpful Links
Maximum Achievable Control Technology (MACT) Standards
Under Section 112(j), 1647, "Permit application obligations for Section 112 (c) of the Clean Air Act (CAA)
requires the U.S. EPA to publish a list of industry group (
major source and area source) categories and
subcategories that employ, manufacture, or emit
hazardous air pollutants (HAP). The 1990 CAA
Amendments require the U.S.EPA to promulgate technology-based emission standards and allows for the
possible supplementation of health based standards. The regulatory standard, for the HAP sources, is the
Maximum Achievable Control Technology (MACT) standard. Prior to the 1990 CAA Amendments, the
regulatory standards for the HAP sources were health based standards. The 1970 CAA Amendments had
established the
National Emission Standards for Hazardous Air Pollutants (NESHAP) program, establishing
standards and providing national conformity. A NESHAP based on Maximum Achievable Control
Technology is called a MACT standard or simply a MACT.

Permitting and Compliance Assessment of Area Source Maximum Achievable Control
Technology

The Division of Air Pollution Control (DAPC) has created a memo to provide permitting staff DAPC’s
position concerning the permitting and compliance assessment of area source Maximum Achievable
Control Technology (MACT) standards (also known as Generally Available Control Technologies
(GACTs)). Over the past decade, a significant number of new rules have been adopted that specifically
apply to area sources. For area sources within each source category, the Clean Air Act allows U.S. EPA
to develop standards or requirements which provide for the use of generally available control technologies
(GACT) or management practices rather than the maximum achievable control technology (MACT)
required for major sources. MACT requirements apply to major sources of HAPs or area sources, and
these standards are congressionally mandated. GACT standards apply to some area sources, and they
are considered to be an optional alternative approach to MACT.

What is a MACT Standard?

The Maximum Achievable Control Technology standard is a level of control that was introduced by Title III
of the 1990 Clean Air Act Amendments. The purpose of these Amendments was to expedite the
development of standards that would reduce HAP emissions.

When developing a MACT standard for a particular source category, U.S. EPA looks at the level of
emission control currently being achieved by the best-performing similar sources through various control
methods, such as clean processes, control devices and work practices. These emission levels set a
baseline, often referred to as the "MACT floor", for the MACT standard.

The "MACT floor" is the initial determination of the MACT standard for each industry source category. It
provides the minimum level of HAP emission control requirement for new and existing sources. The MACT
floor for new sources is equivalent to the level of HAP emission control achieved by the best-controlled
similar source, and the "MACT floor" for existing sources is the average level of HAP emission control
achieved by the top 12% of that industry group's currently operating sources. At a minimum, a MACT
standard must achieve, throughout the industry, a level of emissions control that is at least equivalent to
the MACT floor. Under 1990 CAA Amendments, U.S. EPA can establish a more stringent standard when
this makes economic, environmental, and public health sense.

Who is regulated by the MACT standards?
All source categories that include major sources and area sources of HAPs are listed within section 112(c)
of the Clean Air Act. This list has been divided into three groups, or "bins" of MACT standards.
The two- and four-year standards were required to be promulgated within four years of the passage of the
Clean Air Act Amendment of 1990, which was in 1994. The seven-year standards were required
to be promulgated in 1997, and the ten-year standards are required to be promulgated in the year 2000.
The determination whether or not area sources in any given source category should be regulated is based
upon the health risk those sources present to the public.
What MACT standard applies to my company?

All source categories and subcategories that include major sources and area sources of HAP are listed within Section 112(c) of the CAA. To find which MACT standards apply to your company, first select
the best matched source category from the MACT promulgated standard list source description. Then, from this list, an industry can obtain further information about what processes are regulated by the
MACT standard, and what are the compliance deadlines in the standard.

The list of promulgated MACT standards.

The compliance deadlines according to 112 (e)(1)(A), for MACT standard promulgation for an industry source, are to be within 10 years of the enactment of the CAA Amendments, or within 2 years from the
date the categories or subcategories were listed for an industry source, whichever is later. The completion schedule for this list includes 40 categories to be completed within 2 years of the 1990
Amendments, with 25% of the remaining entries on the list to be completed within 4 years of the 1990 Amendments, another 25% within 7 years, and the remainder before the 10 year deadline.
Toll Free: +1 (866) 467 - 9374
Main: +1 (918) 708-1253
Product Inquiry
Purchase Plans
Services
© 2009 All Rights Reserved.   Visit our sitemap page for more information or contact the Webmaster.
Our working process
in 3 steps




planing & strategy





test & deliver





design & develop
Implement proven equipment designs with
chemical, thermal and biological reactions
Results shall be based on reaction rates
and proper control logic.
Our Corporate goal is to implement the
proper metals, instruments and controls to
achieve the required result with the least
amount of maintenance and associated
energy costs.
We pride ourselves in going the extra mile
before it leaves the plant. It is our way of
knowing that you are receiving correctly
designed equipment to meet your specific
needs.